Welcome About Our Group Get Involved Monthly Meetings Calendar Links Contact
Our Current Work
Jammu/Kashmir Action File
Death Penalty
Paraguay, Argentina & Brazil
Japan, the Koreas & Mongolia
The Philippines
Other
Local Partnerships
the gray space performance company
AIUSA Group 315 - Minnetonka
AIUSA Group 640 - St. Paul
Amnesty International Worldwide
Amnesty International USA

Sign up for e37!
Our monthly e-mail update keeps you in the know about local Amnesty International events, action alerts, and human rights news.
→ Details

e37 Publication Schedule

This Month

Draft e37 Compiled and Circulated: Tuesday, April 1st

e37 Finalized and Published: Sunday, April 6th

General Publication Schedule

Anticipating the Next Update

The e37 update is generally drafted and circulated for review around the end of each month and published early in the subsequent month.

The time points used by Gabe as he plans how to integrate the e37 with the rest of his life are listed below. Generally, you can count on these time points for planning when to submit items or event notices, speaker information, or actions for inclusion; when anticipating when a draft will be circulated for comment; and when an issue will be published.

Requesting and Notification of Schedule Changes

If you play a key role in publication or have items to add and this general schedule is problematic for a particular issue, please notify Gabe and he will work to accomodate these needs. Gabe will similarly announce to active members if an upcoming update will vary significantly from this general schedule. If you do not have Gabe's e-mail address handy, send a note to Group 37 using this site's Contact Us form.

The Schedule (as a Table)

Approximate DateShort DescriptionDetails
Each 25thDraft Compilede37 draft is compiled from all materials collected up to that point. Important missing items identified. Draft sent out to regular editors and other group members where appropriate. Updates and missing information requested from appropriate people.
25th through 2ndDraft Circulated for CommentDraft update is out for review, comment, and updates. This window will be 5 days at a minimum, longer at the request of an editor, and will "slide" with any delays in the distribution of the initial draft (that is, if the draft is sent out on the 31st, the comment window will be open until at least the 6th.)
Each 3rdFinal Edits and PublicationComments and requested missing information are integrated into draft by Gabe. At this point, items may be added without comment only if they have been received through official AI channels (e.g. Urgent Actions) or are announcements for events co-sponsored by AI (presuming that the sponsoring group has reviewed the appropriateness of AI's co-sponsorship). After updates are integrated into the draft, the draft will be published to the full list.
Last Update: 1 April 2008
© 2008 Amnesty International USA Group 37